Case Study
Premier Inn Blackpool

Blackpool, Lancashire – Premier Inn, Blackpool South Pier Hotel for Whitbread PLC (2025)   

Main Contractor: McGoff Construction Limited
Specialist Contractor: Panacea Building Systems
Specialist Electrical Contractor: Edencroft Building Services
Contract value: £170,000

Project Overview

Panacea Building Systems, working alongside their sister company McGoff Group Facilities Services, played a key role in delivering a fast-track refurbishment of the Premier Inn at Blackpool South Pier as part of Whitbread PLC’s “Accelerating Growth Plan.” The project involved the full strip-out and refurbishment of a 2-storey hotel, transforming the internal layout and upgrading facilities to meet modern hospitality standards within a highly compressed programme. 

Scope of Works

Panacea Building Systems delivered a comprehensive internal and external package, including:

  • Full strip-out and refurbishment works in coordination with the main contractor, McGoff Group Facilities Services

  • Formation of new bedrooms using structural Metsec SFS studs

  • Installation of SFS suspended ceiling joists

  • Specialist drylining systems

  • Suspended ceiling installations

  • Plaster finishes throughout

  • External rendering works

The refurbishment covered:

  • 15 guest bedrooms

  • Restaurant and food & beverage areas

  • Back-of-house utility and service spaces   

  • The refurbished Premier Inn at Blackpool South Pier now provides a modern, high-quality hospitality environment aligned with Whitbread’s brand standards. The upgraded bedrooms, restaurant and service areas enhance both guest experience and operational efficiency. Panacea Building Systems contribution ensured a high-quality finish delivered at pace, demonstrating their capability in fast-track refurbishment projects within the hospitality sector.