Case Study
Purley Care Home
Purley, Croydon – 72 Bed Care Home for Barchester Health Care (2021-2022)
Main Contractor: McGoff Construction Limited
Specialist Contractor: Panacea Building Systems
Contract Value: £630,000
Project Overview
Panacea Building Systems was appointed by McGoff Construction Ltd to deliver various internal packages for a 72- bed care home in Purley, Croydon, on behalf of Barchester Health Care. The project involved working within a 4-storey traditionally constructed building, incorporating a lower ground floor level and high-quality resident-focused design features.
Scope of Works
Panacea Building Systems was responsible for delivering a comprehensive internal package across the entire development, including:
Specialist drylining systems
Internal partition installations
Suspended ceiling systems
Taping and jointing works throughout
These works covered all bedrooms, communal areas and support spaces across the multi-level building.
Outcome
-
The completed 72-bed care home in Purley provides a modern, high-quality living environment for residents, with welldesigned spaces and strong connections to outdoor areas. Panacea Building Systems contribution ensured an exceptional standard of finish, and the final development stands as a credit to all parties involved.