Case Study
St Leonards Care Home
St Leonards, East Sussex – 68 Bed Care Home for Barchester Health Care (2020)
Main Contractor: McGoff Construction Limited
Specialist Contractor: Panacea Buildings Systems
Contract Value: £1,430,000
Project Overview
Barchester Health Care appointed the delivery of a new 68-bed care home in St Leonards, East Sussex. The project demanded a resilient structural solution capable of withstanding challenging coastal weather while meeting strict programme timelines and high-quality standards expected by the client.
Scope of Works
The scheme centred on the construction of a 3-storey care home using Panacea Building Systems Metframe system, supported by a full internal drylining package.
Key aspects included:
Metframe superstructure erected over three floors.
Timber trussed roof system enhanced with GRP dormers.
Specialist drylining package, fully tested and performance certified.
Programme acceleration measures to mitigate adverse weather conditions.
Outcome
-
The completed 68-bed care home provides Barchester Health Care with a modern, high-performance facility delivered under challenging site and weather conditions. Panacea Building Systems strategic planning, flexible working methods, and robust Metframe solution ensured the project was completed efficiently, safely, and to a consistently high standard.