Case Study
Warwick Rd South
Warwick Road South Apartment Scheme,
Old Trafford, Greater Manchester
Southway Housing Trust (2024-2025)
Main Contractor: McGoff Construction Limited
Specialist Contractor: Panacea Buildings Systems
Project Overview
McGoff Construction Limited appointed Panacea Building Systems to deliver the structural and internal fit-out works for a flagship residential development on Warwick Road South.
The scheme comprises three high-quality apartment blocks providing 80 much-needed affordable homes, reinforcing Southway Housing Trust’s commitment to delivering sustainable, community-focused housing solutions.
At the heart of this development is Panacea’s advanced LGSF offsite construction solution — engineered to accelerate programme delivery, enhance quality control, and provide cost certainty from design through to completion.
Scope of Works
Panacea Building Systems delivered a fully integrated structural and internal package, reducing interface risk and ensuring seamless programme coordination.
Stuctural Delivery
Three apartment blocks were constructed using Panacea’s bespoke LGSF (Light Gauge Steel Frame) offsite system which was fabricated at their offsite facility in Altrincham, Greater Manchester
Block A: 5 storeys with reinforced concrete floor and roof slabs
Blocks B & C: 4 storeys each with reinforced concrete floor and roof slabs
Self-erect tower crane solution strategically relocated between blocks
Internal Fit-Out
Complete drylining installation
Suspended ceiling systems
Full plastering package to high-performance finish
-
“The light gauge framing system, fabricated off-site at Panacea's facilities in Altrincham, truly proved to be the "Panacea" for this project.
— Testimonial from Jon Bishop, Operations Director - McGoff Construction